Plant Machinery

1 Land Area 46655 sq. meters.
2 Shed Area 14000 sq. meters.
3 Project Cost Rs. 700 Millions
4 Bach house Fully Automized Batch house enable to maintain 220 MT draw ratio for cullet and batch in 24 hrs.
5 Glass furnace Capacity Regenerative furnace 220 MT/ Day (Holding Capacity 240MT), Natural Gas Fired Regenerated furnace with 3 stage refining.
6 IS Machines Six High speed DG 5” & 4 1/4“ IS-8 section Machines, Capable to Produce any shape, size and weight bottles.
7 Lehrs Six automized 8 feet wide lehrs enable for best annealing for glass bottles.
8 Captive Power Plant 3 x 1.5MW Gas Based Generator Set & 1 x 1 MW Diesel Generator
9 Electricity 125 KVA with DGVCL
10 Gas 35000 SCM/Day from ONGC.